Electrical & Engineering

Complete mechanical and electrical installation of Arc Leisure Centre

Woodward Group is proud to have provided a complete electrical fit-out of the newly built leisure facility ‘Go Active @ The Arc’, including its swimming pool. The £4m project sought to build a new leisure extension to the existing council offices with a new contemporary and sustainable facility.

Our design and engineering team worked closely with Bolsover District Council and the Pulse team to plan, design and install all main distributions, sub mains, small power, LED lighting, and communications.

Working to a strict schedule and coordinating works with several other trades on-site at one time, our team installed a purpose built electrical system that is safe to operate in the demanding environments of a leisure facility, and is fully compliant to the latest regulations.

CLIENT:

Pulse for Arc Leisure Group


SECTOR:

Hospitality and Leisure


PROJECT:

Complete electrical fit-out of leisure centre, including swimming pool .


BUDGET:

£200,000


WOODWARD DIVISION:

Electrical & Engineering


REQUIREMENT:

To provide and install an energy efficient scheme for LED lighting, including emergency lighting.


PROCESS:

Tender 


BACKGROUND:

The £4million project to build a new leisure extension to the existing council offices in Bolsover provides a new, contemporary and sustainable facility for the local community. The building features a 25m pool, complete with learner pool, a large fully-equipped gym, two studios, a spinning studio, four badminton courts within a sports hall, soft play area, thermal suite, café and reception area, outdoor sports pitches, and overflow car parking.


SOLUTION & OUTCOMES:

Woodward Group’s design and engineering team worked closely with Bolsover District Council and the Pulse team to plan, design and install:

  • All main distributions
  • Sub Mains
  • Small power
  • LED lighting
  • Communications

Working to a tight schedule and coordinating on-site works with several other trades on-site, the team installed a purpose-built electrical system that is safe to operate in the demanding environments of a leisure facility, fully compliant with all current legislation, and future-proofed for sustainability.


Client testimonial:

“Our teams worked well together, especially considering the need to work around the existing council offices and leisure centre, that remained operational throughout construction, in order to avoid disruption to the work of the council and the leisure centre’s facilities remained available.”